15152 Federal Register / Vol. 73, No. 56 / Friday, March 21, 2008 / Notices
the Reasonable-Further-Progress SIP for
Any person desiring to intervene or to ENVIRONMENTAL PROTECTION
the Houston-Galveston-Brazoria ozone
protest in any of the above proceedings AGENCY
nonattainment area. Each of these
must file in accordance with Rules 211
[EPA鈥揜06鈥揙AR鈥?2007鈥?0524; FRL鈥?8544鈥?9]
submissions revised the motor vehicle
and 214 of the Commission鈥檚 Rules of
emissions budgets (MVEB) in these
Practice and Procedure (18 CFR 385.211 Adequacy Status of Submitted State
areas. The MVEB is the amount of
and 385.214) on or before 5 p.m. Eastern Implementation Plans for
emissions allowed in the state
time on the specified comment date. It Transportation Conformity Purposes:
implementation plan for on-road motor
is not necessary to separately intervene Motor Vehicle Emissions Budgets for
vehicles; it establishes an emissions
again in a subdocket related to a the Houston-Galveston-Brazoria and
ceiling for the regional transportation
compliance filing if you have previously the Dallas-Fort Worth 8-Hour Ozone
network.
Nonattainment Areas
intervened in the same docket. Protests
The Dallas-Fort Worth RFP SIP
will be considered by the Commission
Environmental Protection
AGENCY: contains MVEBs for the year 2008. In
in determining the appropriate action to Agency (EPA). this SIP, the emissions budget for VOCs
be taken, but will not serve to make
is 119.81 tons per day (tpd); the NOX
ACTION: Notice of adequacy
protestants parties to the proceeding.
emissions budget is 249.33 tpd. The
determination.
Anyone filing a motion to intervene or Dallas-Fort Worth Attainment
protest must serve a copy of that In this notice, EPA is
SUMMARY: Demonstration SIP contains MVEBs for
document on the Applicant. In reference notifying the public that we have found the year 2009. In the attainment SIP, the
to filings initiating a new proceeding, the on-road motor vehicle emissions emissions budget for VOCs is 99.09 tpd;
budgets (MVEB) contained in the
interventions or protests submitted on the NOX emissions budget is 186.81 tpd.
revisions to the Houston-Galveston-
or before the comment deadline need The Houston-Galveston-Brazoria RFP
Brazoria 8-hour ozone reasonable
not be served on persons other than the SIP contains MVEBs for the year 2008.
further progress plan and the Dallas-Fort
Applicant. In this SIP, the emissions budget for
Worth 8-hour ozone attainment VOCs is 86.77 tpd; the NOX emissions
The Commission encourages
demonstration plan adequate for budget is 186.13 tpd.
electronic submission of protests and
transportation conformity purposes. As On June 28, 2007, the availability of
interventions in lieu of paper, using the
a result of our finding, the budgets from all of these budgets was posted on EPA鈥檚
FERC Online links at http:// the submitted state implementation plan Web site for the purpose of soliciting
www.ferc.gov. To facilitate electronic revisions must be used for future public comments. The comment period
service, persons with Internet access conformity determinations in the closed on July 30, 2007, and we
who will eFile a document and/or be Houston-Galveston-Brazoria and the received no comments.
listed as a contact for an intervenor Dallas-Fort Worth areas. Today鈥檚 notice is simply an
must create and validate an DATES: These budgets are effective April announcement of a finding that we have
eRegistration account using the 7, 2008. already made. EPA Region 6 sent a letter
eRegistration link. Select the eFiling
FOR FURTHER INFORMATION CONTACT: The to the Texas Commission on
link to log on and submit the essential information in this notice will Environmental Quality on October 24,
intervention or protests. be available at EPA鈥檚 conformity Web 2007, finding that the motor vehicle
Persons unable to file electronically site: http://www.epa.gov/otaq/ emissions budgets for the Houston-
should submit an original and 14 copies stateresources/transconf/adequacy.htm. Galveston-Brazoria 8-county ozone
You may also contact Mr. Guy
of the intervention or protest to the nonattainment area and the Dallas-Fort
Donaldson, Air Planning Section (6PD鈥?
Federal Energy Regulatory Commission, Worth 9-county ozone nonattainment
L), U.S. EPA Region 6, 1445 Ross area are adequate and must be used for
888 First St., NE., Washington, DC
Avenue, Dallas, Texas 75202鈥?2733, transportation conformity
20426.
telephone (214) 665鈥?7242, E-mail determinations.
The filings in the above proceedings
address: Donaldson.Guy@epa.gov. Transportation conformity is required
are accessible in the Commission鈥檚
by Section 176(c) of the Clean Air Act.
SUPPLEMENTARY INFORMATION:
eLibrary system by clicking on the
EPA鈥檚 conformity rule, 40 CFR part 93,
Throughout this document 鈥樷?榳e,鈥欌?? 鈥樷?榰s,鈥欌??
appropriate link in the above list. They
requires that transportation plans,
and 鈥樷?榦ur鈥欌?? refers to EPA. The word
are also available for review in the
programs and projects conform to SIPs
鈥樷?榖udget(s)鈥欌?? refers to the mobile source
Commission鈥檚 Public Reference Room in and establishes the criteria and
emissions budget for volatile organic
Washington, DC. There is an procedures for determining whether or
compounds (VOCs) and the mobile
eSubscription link on the Web site that not they do so. Conformity to a SIP
source emissions budget for nitrogen
enables subscribers to receive e-mail means that transportation activities will
oxides (NOX). The word 鈥樷?楽IP鈥欌?? in this
notification when a document is added not produce new air quality violations,
document refers to the State
to a subscribed dockets(s). For worsen existing violations, or delay
Implementation Plan revision submitted
assistance with any FERC Online timely attainment of the National
by the State of Texas in June, 2007, in
service, please e-mail Ambient Air Quality Standards. The
partial fulfillment of its obligations for
FERCOnlineSupport@ferc.gov or call criteria by which EPA determines
the 8-hour ozone National Ambient Air
(866) 208鈥?3676 (toll free). For TTY, call whether a SIP鈥檚 motor vehicle emission
Quality Standard.
(202) 502鈥?8659. budgets are adequate for conformity
In June 2007, we received several SIP
purposes are outlined in 40 CFR
revisions from the Texas Commission
Nathaniel J. Davis, Sr.,
mstockstill on PROD1PC66 with NOTICES
93.118(e)(4).
on Environmental Quality (TCEQ).
Deputy Secretary. Please note that such an adequacy
These revisions included the
[FR Doc. E8鈥?5765 Filed 3鈥?20鈥?08; 8:45 am] review is separate from EPA鈥檚
Reasonable-Further-Progress (RFP) SIP
completeness review, and it should not
and the Attainment Demonstration SIP
BILLING CODE 6717鈥?01鈥揚
be used to prejudge EPA鈥檚 ultimate
for the Dallas-Fort Worth ozone
approval of either of the SIPs. Even if
nonattainment area. We also received
VerDate Aug<31>2005 18:33 Mar 20, 2008 Jkt 214001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\21MRN1.SGM 21MRN1
15153
Federal Register / Vol. 73, No. 56 / Friday, March 21, 2008 / Notices
Summary: EPA continues to have
we find a budget adequate, either SIP 03/14/2008. Pursuant to 40 CFR
environmental concerns about
could later be disapproved. 1506.9.
cumulative impacts to air quality, EIS No. 20080090, Draft EIS, BIA, CA,
Authority: 42 U.S.C. 7401 et seq.
especially with the level of resource Enterprise Rancheria Gaming Facility
Dated: March 5, 2008. development in southwest Wyoming. and Hotel Fee-To-Trust Acquisition
Richard E. Greene,
EIS No. 20080007, ERP No. F鈥揝TA鈥? Project, Implementation, Federal
Regional Administrator, Region 6. J03021鈥?00, Keystone Oil Pipeline Trust, Estom Yumeka Maida Tribe,
[FR Doc. E8鈥?5791 Filed 3鈥?20鈥?08; 8:45 am] Project, Proposed Construction, Yuba County, CA, Comment Period
Connection, Operation and Ends: 05/05/2008, Contact: John
BILLING CODE 6560鈥?50鈥揚
Maintenance, Applicant for Rydzik, 916鈥?978鈥?6042.
Presidential Permit, ND, SD, NE, KS, EIS No. 20080091, Draft EIS, AFS, WY,
ENVIRONMENTAL PROTECTION MO, IL, and OK. Winter Elk Management Programs,
AGENCY Long-Term Special Use Authorization
Summary: EPA expressed
for Wyoming Game and Fish
environmental concerns about wetlands,
[ER鈥揊RL鈥?6697鈥?2]
Commission to use National Forest
and requested clarification on the
System Land within the Bridger-Teton
Environmental Impact Statements and applicability of Executive Order 11990.
National Forest at Alkali Creek, Dog
Regulations; EIS No. 20080027, ERP No. F鈥揘RC鈥?
Creek, Fall Creek, Fish Creek, Muddy
C06017鈥揘Y, GENERIC鈥擩ames A.
Availability of EPA comments Creek, Patrol Cabin, and Upper Green
FitzPatrick Nuclear Power Plant,
prepared pursuant to the Environmental River, Jackson and Sublette, WY,
License Renewal of Nuclear Plant,
Review Process (ERP), under section Comment Period Ends: 05/05/2008,
Site Specific Supplement 31 to
309 of the Clean Air Act and Section Contact: Greg Clark, 307鈥?276鈥?5810.
NUREG鈥?1437, Town of Sriba, NY.
102(2)(c) of the National Environmental EIS No. 20080092, Draft EIS, BIA, MT,
Summary: EPA continues to have
Policy Act as amended. Requests for Absaloka Mine Crow Reservation
environmental concerns about impacts
copies of EPA comments can be directed South Extension Coal Lease Approval,
to fisheries.
to the Office of Federal Activities at Proposed Mine Development Plan,
EIS No. 20080039, ERP No. F鈥揃LM鈥?
202鈥?564鈥?7167. and Related Federal and State
K39018鈥揘V, Kane Springs Valley
An explanation of the ratings assigned Permitting Actions, Crow Indian
Groundwater Development Project, to
to draft environmental impact Reservation, Crow Tribe, Bighorn
Construct Infrastructure Required to
statements (EISs) was published in FR County, MT, Comment Period Ends:
Pump and Convey Groundwater
dated April 6, 2007 (72 FR 17156). 05/05/2008, Contact: George Gover,
Resources, Right-of-Way Application,
406鈥?638鈥?2672.
Draft EISs Lincoln County Water District,
EIS No. 20080093, Final Supplement,
Lincoln County, NV.
EIS No. 20070538, ERP No. D鈥揅OE鈥?
AFS, ID, Meadow Face Stewardship
E30043鈥揘C, North Topsail Beach Summary: EPA continues to have Pilot Project, Improvement to Aquatic
Shoreline Protection Project, Seeking environmental concerns about and Terrestrial Vegetative Conditions,
Federal and State Permits to Allow cumulative impacts to the Kane Springs Supplement Information on the
Implementation of a Non-Federal Valley carbonate-rock aquifer, especially Cumulative Effects Analysis, Nez
Shoreline and Inlet Management long-term reliability. The final EIS did Perce National Forest, Clearwater
Project, New River Inlet, Onslow not include information on water use Ranger District, Idaho County, ID,
County, NC. efficiency, supply and demand Wait Period Ends: 04/21/2008,
management measures, and back-up
Summary: EPA expressed Contact: Darcy Pederson, 208鈥?983鈥?
water supplies; we recommend that this
environmental concerns about the long- 1950.
information be included in the ROD
term impacts to marine habitats and EIS No. 20080094, Final Supplement,
with a commitment to work closely with
migratory species from dredge/fill AFS, ID, North Sheep Allotments鈥?
groundwater users to promote
actions, and requested a more thorough Sheep and Goat Allotment
sustainable use measures.
cumulative impacts analysis and Management Plans, Additional
suggested the Corps consider Information on Analyses Concerning
Dated: March 18, 2008.
developing a broader shoreline Management Indicator Species,
Robert W. Hargrove,
management strategy. Rating EC2. Capable and Suitable Grazing Lands,
Director, NEPA Compliance Division, Office
EIS No. 20080008, ERP No. D鈥揘PS鈥? and Adaptive Management Strategies,
of Federal Activities.
C65006鈥揘Y, Governors Island Authorization of Continued Sheep
[FR Doc. E8鈥?5802 Filed 3鈥?20鈥?08; 8:45 am]
National Monument, General Grazing for Fisher Creek, Smiley
BILLING CODE 6560鈥?50鈥揚
Management Plan, Implementation, Creek, North Fork-Boulder and Baker
New York Harbor, NY. Creek Sheep and Goat Grazing
Allotments, Sawtooth National Forest,
ENVIRONMENTAL PROTECTION
Summary: EPA does not object to the
Ketchum Ranger District, Sawtooth
AGENCY
proposed action. Rating LO.
National Recreation Area, Blaine and
Final EISs [ER鈥揊RL鈥?6697鈥?1]
Custer Counties, ID, Wait Period
Ends: 04/21/2008, Contact: Carol
EIS No. 20070553, ERP No. F鈥揃LM鈥? Environmental Impacts Statements;
Brown, 208鈥?727鈥?5000.
J65433鈥揥Y, Rawlins Field Office Notice of Availability
EIS No. 20080095, Draft EIS, NOA, OR,
Planning Area Resource Management
mstockstill on PROD1PC66 with NOTICES
Responsible Agency: Office of Federal Bull Run Water Supply Habitat
Plan, Addresses the Comprehensive
Activities, General Information (202) Conservation Plan, Application for
Analysis of Alternatives for the
564鈥?7167 or http://www.epa.gov/ and Incidental Take Permit to cover
Planning and Management of Public
compliance/nepa/. the Continued Operation and
Land and Resource Administered by
Maintenance, Sandy River Basin, City
(BLM), Albany, Carbon, Laramie and Weekly receipt of Environmental Impact
of Portland, OR, Comment Period
Sweetwater Counties, WY. Statements filed 03/10/2008 through
VerDate Aug<31>2005 18:33 Mar 20, 2008 Jkt 214001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\21MRN1.SGM 21MRN1
|