15153
Federal Register / Vol. 73, No. 56 / Friday, March 21, 2008 / Notices
Summary: EPA continues to have
we find a budget adequate, either SIP 03/14/2008. Pursuant to 40 CFR
environmental concerns about
could later be disapproved. 1506.9.
cumulative impacts to air quality, EIS No. 20080090, Draft EIS, BIA, CA,
Authority: 42 U.S.C. 7401 et seq.
especially with the level of resource Enterprise Rancheria Gaming Facility
Dated: March 5, 2008. development in southwest Wyoming. and Hotel Fee-To-Trust Acquisition
Richard E. Greene,
EIS No. 20080007, ERP No. F鈥揝TA鈥? Project, Implementation, Federal
Regional Administrator, Region 6. J03021鈥?00, Keystone Oil Pipeline Trust, Estom Yumeka Maida Tribe,
[FR Doc. E8鈥?5791 Filed 3鈥?20鈥?08; 8:45 am] Project, Proposed Construction, Yuba County, CA, Comment Period
Connection, Operation and Ends: 05/05/2008, Contact: John
BILLING CODE 6560鈥?50鈥揚
Maintenance, Applicant for Rydzik, 916鈥?978鈥?6042.
Presidential Permit, ND, SD, NE, KS, EIS No. 20080091, Draft EIS, AFS, WY,
ENVIRONMENTAL PROTECTION MO, IL, and OK. Winter Elk Management Programs,
AGENCY Long-Term Special Use Authorization
Summary: EPA expressed
for Wyoming Game and Fish
environmental concerns about wetlands,
[ER鈥揊RL鈥?6697鈥?2]
Commission to use National Forest
and requested clarification on the
System Land within the Bridger-Teton
Environmental Impact Statements and applicability of Executive Order 11990.
National Forest at Alkali Creek, Dog
Regulations; EIS No. 20080027, ERP No. F鈥揘RC鈥?
Creek, Fall Creek, Fish Creek, Muddy
C06017鈥揘Y, GENERIC鈥擩ames A.
Availability of EPA comments Creek, Patrol Cabin, and Upper Green
FitzPatrick Nuclear Power Plant,
prepared pursuant to the Environmental River, Jackson and Sublette, WY,
License Renewal of Nuclear Plant,
Review Process (ERP), under section Comment Period Ends: 05/05/2008,
Site Specific Supplement 31 to
309 of the Clean Air Act and Section Contact: Greg Clark, 307鈥?276鈥?5810.
NUREG鈥?1437, Town of Sriba, NY.
102(2)(c) of the National Environmental EIS No. 20080092, Draft EIS, BIA, MT,
Summary: EPA continues to have
Policy Act as amended. Requests for Absaloka Mine Crow Reservation
environmental concerns about impacts
copies of EPA comments can be directed South Extension Coal Lease Approval,
to fisheries.
to the Office of Federal Activities at Proposed Mine Development Plan,
EIS No. 20080039, ERP No. F鈥揃LM鈥?
202鈥?564鈥?7167. and Related Federal and State
K39018鈥揘V, Kane Springs Valley
An explanation of the ratings assigned Permitting Actions, Crow Indian
Groundwater Development Project, to
to draft environmental impact Reservation, Crow Tribe, Bighorn
Construct Infrastructure Required to
statements (EISs) was published in FR County, MT, Comment Period Ends:
Pump and Convey Groundwater
dated April 6, 2007 (72 FR 17156). 05/05/2008, Contact: George Gover,
Resources, Right-of-Way Application,
406鈥?638鈥?2672.
Draft EISs Lincoln County Water District,
EIS No. 20080093, Final Supplement,
Lincoln County, NV.
EIS No. 20070538, ERP No. D鈥揅OE鈥?
AFS, ID, Meadow Face Stewardship
E30043鈥揘C, North Topsail Beach Summary: EPA continues to have Pilot Project, Improvement to Aquatic
Shoreline Protection Project, Seeking environmental concerns about and Terrestrial Vegetative Conditions,
Federal and State Permits to Allow cumulative impacts to the Kane Springs Supplement Information on the
Implementation of a Non-Federal Valley carbonate-rock aquifer, especially Cumulative Effects Analysis, Nez
Shoreline and Inlet Management long-term reliability. The final EIS did Perce National Forest, Clearwater
Project, New River Inlet, Onslow not include information on water use Ranger District, Idaho County, ID,
County, NC. efficiency, supply and demand Wait Period Ends: 04/21/2008,
management measures, and back-up
Summary: EPA expressed Contact: Darcy Pederson, 208鈥?983鈥?
water supplies; we recommend that this
environmental concerns about the long- 1950.
information be included in the ROD
term impacts to marine habitats and EIS No. 20080094, Final Supplement,
with a commitment to work closely with
migratory species from dredge/fill AFS, ID, North Sheep Allotments鈥?
groundwater users to promote
actions, and requested a more thorough Sheep and Goat Allotment
sustainable use measures.
cumulative impacts analysis and Management Plans, Additional
suggested the Corps consider Information on Analyses Concerning
Dated: March 18, 2008.
developing a broader shoreline Management Indicator Species,
Robert W. Hargrove,
management strategy. Rating EC2. Capable and Suitable Grazing Lands,
Director, NEPA Compliance Division, Office
EIS No. 20080008, ERP No. D鈥揘PS鈥? and Adaptive Management Strategies,
of Federal Activities.
C65006鈥揘Y, Governors Island Authorization of Continued Sheep
[FR Doc. E8鈥?5802 Filed 3鈥?20鈥?08; 8:45 am]
National Monument, General Grazing for Fisher Creek, Smiley
BILLING CODE 6560鈥?50鈥揚
Management Plan, Implementation, Creek, North Fork-Boulder and Baker
New York Harbor, NY. Creek Sheep and Goat Grazing
Allotments, Sawtooth National Forest,
ENVIRONMENTAL PROTECTION
Summary: EPA does not object to the
Ketchum Ranger District, Sawtooth
AGENCY
proposed action. Rating LO.
National Recreation Area, Blaine and
Final EISs [ER鈥揊RL鈥?6697鈥?1]
Custer Counties, ID, Wait Period
Ends: 04/21/2008, Contact: Carol
EIS No. 20070553, ERP No. F鈥揃LM鈥? Environmental Impacts Statements;
Brown, 208鈥?727鈥?5000.
J65433鈥揥Y, Rawlins Field Office Notice of Availability
EIS No. 20080095, Draft EIS, NOA, OR,
Planning Area Resource Management
mstockstill on PROD1PC66 with NOTICES
Responsible Agency: Office of Federal Bull Run Water Supply Habitat
Plan, Addresses the Comprehensive
Activities, General Information (202) Conservation Plan, Application for
Analysis of Alternatives for the
564鈥?7167 or http://www.epa.gov/ and Incidental Take Permit to cover
Planning and Management of Public
compliance/nepa/. the Continued Operation and
Land and Resource Administered by
Maintenance, Sandy River Basin, City
(BLM), Albany, Carbon, Laramie and Weekly receipt of Environmental Impact
of Portland, OR, Comment Period
Sweetwater Counties, WY. Statements filed 03/10/2008 through
VerDate Aug<31>2005 18:33 Mar 20, 2008 Jkt 214001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\21MRN1.SGM 21MRN1
|