Radon Testing Results
Apollo Middle
Constructed 1969
Schools constructed, or structurally changed, prior to
July 1, 1999 require testing to be conducted in 100% of
the first floor habitable rooms. Follow up testing will be
conducted in a minimum of 5% of the first floor habitable
rooms after five years.
Testing Testing Radon Average
Story Comments
Room Start Date End Date pCi/L Radon pCi/L
103 1 4/9/90 4/11/90 0.4
103A 1 4/9/90 4/11/90 0.6
103D 1 4/9/90 4/11/90 0.4
103E 1 4/9/90 4/11/90 0.6
150 1 4/9/90 4/11/90 1.8
150 1 4/9/90 4/11/90 1.9
151A 1 4/9/90 4/11/90 0.6
152 1 4/9/90 4/11/90 0.4
152 1 4/9/90 4/11/90 0.4
152 1 4/9/90 4/11/90 0.4
152 1 4/9/90 4/11/90 0.4
156 1 4/9/90 4/11/90 1.6
157 1 4/9/90 4/11/90 0.4
157 1 4/9/90 4/11/90 0.4
158B 1 4/9/90 4/11/90 0.5
163 1 4/9/90 4/11/90 0.8
164 1 4/9/90 4/11/90 0.4
165 1 4/9/90 4/11/90 0.4
165 1 4/9/90 4/11/90 0.4
165A 1 4/9/90 4/11/90 0.4
165B 1 4/9/90 4/11/90 0.4
1665 1 4/9/90 4/11/90 0.4
168 1 4/9/90 4/11/90 0.4
168 1 4/9/90 4/11/90 0.4
169 1 4/9/90 4/11/90 0.4
170 1 4/9/90 4/11/90 0.4
171 1 4/9/90 4/11/90 0.4
175 1 4/9/90 4/11/90 0.4
175 1 4/9/90 4/11/90 0.4
175 1 4/9/90 4/11/90 0.4
181 1 4/9/90 4/11/90 0.4
181 1 4/9/90 4/11/90 0.4
181C 1 4/9/90 4/11/90 0.4
182 1 4/9/90 4/11/90 0.4
182D 1 4/9/90 4/11/90 0.4
183 1 4/9/90 4/11/90 0.4
183 1 4/9/90 4/11/90 0.4
184 1 4/9/90 4/11/90 0.4
185 1 4/9/90 4/11/90 0.4
201 1 4/9/90 4/11/90 0.4
201H 2 4/9/90 4/11/90 0.4
201J 2 4/9/90 4/11/90 0.4
201L 2 4/9/90 4/11/90 0.4
201 2 4/9/90 4/11/90 0.4
201R 2 4/9/90 4/11/90 0.4
201R 2 4/9/90 4/11/90 0.4
201S 2 4/9/90 4/11/90 0.4
201T 2 4/9/90 4/11/90 0.4
201W 2 4/9/90 4/11/90 0.4
201X 2 4/9/90 4/11/90 0.4
201Y 2 4/9/90 4/11/90 0.4
211 1 4/9/90 4/11/90 1.5
211 1 4/9/90 4/11/90 1.5
211A 1 4/9/90 4/11/90 1.3
211B 1 4/9/90 4/11/90 1.6
211C 1 4/9/90 4/11/90 0.7
212 1 4/9/90 4/11/90 0.8
212A 1 4/9/90 4/11/90 0.4
213 1 4/9/90 4/11/90 1.0
213 1 4/9/90 4/11/90 1.0
213A 1 4/9/90 4/11/90 1.1
215 1 4/9/90 4/11/90 1.4
105 1 4/8/96 4/10/96 1.3
106 1 4/8/96 4/10/96 0.3
107 1 4/8/96 4/10/96 0.4
107 1 4/8/96 4/10/96 0.6
108 1 4/8/96 4/10/96 0.4
109 1 4/8/96 4/10/96 0.8
110 1 4/8/96 4/10/96 0.3
112 1 4/8/96 4/10/96 1.1
113 1 4/8/96 4/10/96 0.4
114 1 4/8/96 4/10/96 0.8
115 1 4/8/96 4/10/96 0.8
116 1 4/8/96 4/10/96 0.3
117 1 4/8/96 4/10/96 0.5
118 1 4/8/96 4/10/96 0.2
119 1 4/8/96 4/10/96 0.6
120 1 4/8/96 4/10/96 0.9
122 1 4/8/96 4/10/96 1.1
122 1 4/8/96 4/10/96 0.9
201 2 4/8/96 4/10/96 0.2
201H 2 4/8/96 4/10/96 0.2
212 1 4/8/96 4/10/96 2.4
213 1 4/8/96 4/10/96 3.3
213 1 4/8/96 4/10/96 2.9
|