Radon Testing Results
Bethune Elementary
Constructed 1961
Schools constructed, or structurally changed, prior to
July 1, 1999 require testing to be conducted in 100% of
the first floor habitable rooms. Follow up testing will be
conducted in a minimum of 5% of the first floor habitable
rooms after five years.
Testing Testing Radon Average
Story Comments
Room Start Date End Date pCi/L Radon pCi/L
101 1 02/16/90 02/18/90 0.4
101A 1 02/16/90 02/18/90 0.4
102 1 02/16/90 02/18/90 0.4
102A 1 02/16/90 02/18/90 0.4
104 1 02/16/90 02/18/90 0.4
105 1 02/16/90 02/18/90 0.4
201 1 02/16/90 02/18/90 0.4
202 1 02/16/90 02/18/90 0.4
203 1 02/16/90 02/18/90 0.4
204 1 02/16/90 02/18/90 0.4
205 1 02/16/90 02/18/90 0.4
206 1 02/16/90 02/18/90 0.4
207 1 02/16/90 02/18/90 0.4
208 1 02/16/90 02/18/90 0.4
301 1 02/16/90 02/18/90 0.4
301 1 02/16/90 02/18/90 0.4
302 1 02/16/90 02/18/90 0.4
401 1 02/16/90 02/18/90 0.4
401 1 02/16/90 02/18/90 0.4
401A 1 02/16/90 02/18/90 0.4
402 1 02/16/90 02/18/90 0.4
501 1 02/16/90 02/18/90 0.4
502 1 02/16/90 02/18/90 0.4
503 1 02/16/90 02/18/90 0.4
504 1 02/16/90 02/18/90 0.4
505 1 02/16/90 02/18/90 0.4
505 1 02/16/90 02/18/90 0.4
506 1 02/16/90 02/18/90 0.4
507 1 02/16/90 02/18/90 0.4
508 1 02/16/90 02/18/90 0.4
701 1 02/16/90 02/18/90 0.4
702 1 02/16/90 02/18/90 0.4
702 1 02/16/90 02/18/90 0.4
703 1 02/16/90 02/18/90 0.4
704 1 02/16/90 02/18/90 0.4
101 0.4
04/04/96 04/06/96
1
201 0.6
04/04/96 04/06/96
1
202 1.2
04/04/96 04/06/96
1
201 1.0
04/04/96 04/06/96
1
401 0.4
04/04/96 04/06/96
1
501 1.3
04/04/96 04/06/96
1
502 1.1
04/04/96 04/06/96
1
701A 1.6
04/04/96 04/06/96
1
701C 1.2
04/04/96 04/06/96
1
|