9 SPECIALTY ADHESIVES
MENTAL CO
ULTRA/BOND
ON M
IR
M
V
EN
ITM
OUR
ENT
ECO 420
LATEX BASED ALL WEATHER OUTDOOR
庐
CARPET ADHESIVE
LATEX BASED ALL WEATHER OUTDOOR CARPET ADHESIVE
DESCRIPTION 3. APPLICATION
3.1 Use the recommended notched trowels
A highly tackified, one-part, rubber-based outdoor
(see technical data table) with sufficient depth to
adhesive for the installation of indoor/outdoor carpet
ensure that at least 90% of the adhesive transfers
over approved surfaces. Sets rapidly, even in
to the carpet backing. Follow floor covering
unfavorable weather conditions. Waterproof when dry.
manufacturer鈥檚 recommendation regarding proper
Can be used indoors as well.
trowel to use.
3.2 Allow the spread adhesive 10 - 15 minutes drying
USES
time before placing carpet. Install the carpet into
the adhesive while it is still wet. Proper adhesive
For the interior or exterior installation of outdoor
1.
transfer to the backing should be confirmed
dimensionally stable rubber, woven polypropylene
periodically by lifting the material.
(Action Bac庐), and closed cellular urethane foam
backed carpeting. Contact MAPEI鈥檚 Technical 3.3 Roll flooring surface across width and length with
Services Department for other types of carpeting. manufacturer鈥檚 recommended roller to break down
adhesive ridges and ensure complete removal
of entrapped air.
LIMITATIONS
3.4 Complete installation according to flooring
Do not use when the substrate temperature is
1.
manufacturer鈥檚 instructions.
below 50掳F (10掳C) or above 100掳F (38掳C).
3.5 Promptly clean adhesive smudges and tools with
Do not use for installations of vinyl backed carpets
2.
water while adhesive is still fresh.
or solid rubber flooring. Use ULTRA/BOND G19
or G21 (see data sheets for details).
EXPANSION AND CONTROL JOINTS
Do not use over treated wood or plywood. Consult 4.
3.
Provide for expansion and control joints where
4.1
MAPEI鈥檚 Technical Services Department for more
specified.
information.
Do not cover any expansion joints with adhesive.
Not for use over asphalt roofing or treated wood. 4.2
4. OF
MBER
ME
Cut flooring material on both sides along the
4.3
edges of expansion joints. Floor Covering Installation Contractors Association
RECOMMENDED SUBSTRATES
4.4 Insert the specified compressible bead and sealant
鈥? Fully cured concrete. Concrete must be dry at time for expansion and control joints, according to
of installation.
OCIATION OF
ION ASS NO
plans and specifications.
LAT RT
AL H
ST A
IN
M
R
ER
FLOO
鈥? Exterior or marine grade plywood decking.
ICA
PR
N
O
鈥? Asphalt paving (clean and well cured).
O
I
FE
AT
SS
5. PROTECTION
UC
ION
ALISM THROUGH ED
5.1 Restrict traffic for 24 hours to allow proper
adhesive set-up.
SETTING INSTRUCTIONS
5.2 Provide for heated storage on site and deliver all RESILIENT FLOOR COVERING INSTITUTE
SURFACE PREPARATION
1.
materials at least 24 hours before work begins.
See 鈥淪URFACE PREPARATION鈥? Sheet
MIXING
2.
ULTRA/BOND ECO 420 is ready to use.
NAF D
NAF D
No mixing is required. Simply open the container
NAF D
and spread. NAF D
MEMBER
MAPEI
TECHNICAL DATA
Open time at 72掳F (22掳C)
Headquarters of the Americas
50% relative humidity ............................................ Up to 20 minutes (Open times vary based on temperature,
humidity, substrates, and job conditions) 1144 East Newport Center Drive
Initial set .............................................................. 2 - 3 hours Deerfield Beach, Florida 33442
Freeze-thaw stability .............................................. Stable Phone: (954) 246-8888
Fax: (954) 246-8800
Maximum tolerance of moisture
www.mapei.com
vapor emission from the concrete slab
(using the anhydrous calcium chloride test) .............. 3 lbs. per 1000 sq. ft. (1,36 kg/92,9 m2) per 24 hours
Customer Service
Cleanability .......................................................... Water when fresh, mineral spirits when dried
1-800-42-MAPEI
Color .................................................................... Tan
Consistency .......................................................... Creamy Technical Services
Flammability.......................................................... Non-flammable, water based
1-800-992-6273 (U.S. and Puerto Rico)
1-800-361-9309 (Canada)
PACKAGING
Pails: 1 US gal. (3,7 L); 3.96 US gal. (15 L) Additional Information
SHELF LIFE
Website: www.mapei.com
12 months when stored in original containers at room temperature in a dry heated area.
Fax on Demand System
APPROXIMATE COVERAGE
for Technical Data Sheets and MSDS
Typical Recommended Trowel (depth, width, space) (954) 246-8590 (English only)
Smooth back carpet
1/8鈥? x 1/8鈥? x 1/8鈥? 90 - 108 sq. ft./US gal. MAPEI 鈥? USA
(3,2 x 3,2 x 3,2 mm) (2,2 - 2,6 m2/L) Anaheim, California
Ft. Lauderdale, Florida
Rough back carpet and all installations over rough surfaces Fredericksburg, Virginia
3/16鈥? x 1/8鈥? x 1/8鈥? 54 - 72 sq. ft./US gal. Garland, Texas
(4,8 x 3,2 x 3,2 mm) (1,4 - 1,8 m2/L) South River, New Jersey
Tempe, Arizona
NOTE
West Chicago, Illinois
Quantities shown are approximate and given for estimating purposes only. Actual job site coverages may vary
according to substrate conditions, type of trowel used and setting practices. MAPEI 鈥? Canada
HEALTH AND SAFETY
Laval, Qu茅bec
Consult the material safety data sheet for more information.
Brampton, Ontario
Delta, British Columbia
NOTICE
MAPEI 鈥? Puerto Rico
We shall not be liable for incidental and consequential damages, as defined
under the uniform commercial code, directly or indirectly sustained, nor for
any loss caused by application of these goods not in accordance with current Dorado
printed instruction or for other than the intended use. Before using, user shall
determine the suitability of the product for its intended use and user alone
assumes all risks and liability whatsoever in connection therewith. Our liability
is expressly limited to replacement of defective goods. Any claim shall be
deemed waived unless made in writing to us within thirty (30) days from date
it was, or reasonably should have been discovered.
PR4283 DS3E V0303
漏 2003 MAPEI Corp. All Rights Reserved.
Printed in the U.S.A.
|